Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 国产做爰又粗又大免费看真人视频 | 亚洲国产高清视频在线观看 | 又大又长粗又爽又黄少妇视频 | 无码人妻一区二区三区免费n狂飙 | www.jingpin| 久久AV秘 一区二区三区漫画 | 人妻出轨中出欲求无码视频 | 夜精品A片一区二区无码妖精视频 | 鲁鲁视频国产在线播放 | 国产露脸无套进入69 | 无码人妻一级毛片免费60岁 | 欧一美一交一配一交一交一视频 | 人妻激情偷乱一区二区三区 | 黑人无遮挡A片又黄又爽视频 | 成人国产精品秘 在线鲁大男同 | 蜜桃AV鲁一鲁一鲁一鲁俄罗斯的 | 色中文国产馆剧情传媒在线 | 成AV人久久精品无码网红搜索 | 色情乱婬A片AAA毛多水多 | AV成人网站亚洲一二区 | 又粗又爽又猛高潮的在线视频 | 国产黄色小视频在线观看 | 九九国产精品在线观看 | 欧一美一交一乱一交免费看 | 野战农村妇女一级A片 | 新妹窝窝人体色777婷婷婷 | 亚洲AV午夜精品一区 | 免费 无码 欧美精品 | 国产精品久久久久久久蜜臀宾利 | 欧美freesex黑人又粗又大 | 国产亲子伦XXXXX熟妇91色 | 亚洲AV成人一区二区三区观看 | WWW欧美美女按摩性爱com | 亚洲中文字幕精华在线看 | 美女被 又爽 又黄视频免费观看 | 亚洲av永久无码精品一区二区三区 | 亚洲高清国产传媒免费视频 | 久久久久无码国产精品一区洗澡 | 看一级全裸黄色视频在线观看 | 亚洲91无码精品一区在线播放 |